See our progress from the ground up
We started on schedule on Monday, Oct. 25
Removing Our Pro Shop Patio. Built A Temporary Construction Road For Equipment To Access Our Facility. Driving Range Cover Near The Interstate Went Down In Minutes. Topsoil Removed For The Placement Of Our Future Golf Shop. Access To Our Ball Dispenser Will Be Protected By A Construction Fence.
November 22 Update
The New Golf Shop Footprint! Installed A Poly Sheet Followed By Wire Mesh To Reinforce The Concrete Slab. Pouring The Footers. Placing the concrete block.
December 1 Update
Poured The Slab For Our New Golf Shop In The Dark At 5am! Starting To Build The Walls. Here Come The Trusses. Looking At The New Golf Shop From The Mini Golf Course. We Are Under Cover And Inside Walls Are Going Up!
December 10 Update
Inside The New Golf Shop Is Shaping Up. A look back at some key moments in the buildout process so far.
December 23 Update
The Wall To The Double Decker Went Up. It Will Be a 12.5 Ft. Wall At Completion. The Wall By The Interstate Is Up. Finishing Up The HVAC In The Golf Shop. Installing Insulation.
December 31 Update
Starting To Hang Drywall. The New Office & Supply Room. The Ceiling By The New Entrance At Mini Golf Side. The Back Wall Of The Double Decker. Brick By Brick - It's A Lot Of Work!
January 14 Update
Drywall Finishers Took About 3 Days. It's An Art! Walls & Ceiling Are Painted. Steel Beams Going Up & Out To Support The 2nd Floor. The Masons Have Finished The Back & Side Walls!
January 21 Update
The concrete planks are on! The first level is under cover. There will be a 2nd ball dispenser located here under the structure. View from the 2nd level. What a view from up here! I forgot to bring a club & ball though! The carpet tiles completed.
February 2 Update
Light Fixtures Are Up In The Golf Shop. Custom Made Demo Club Rack By Ridgeview Millwork. Walkway Into New Golf Shop. New Patio Construction. New Patio Is Beautiful!
March 5 Update
New Welcome DeskDesigned & Built Locally By Ridgeview Millwork. Custom Made Demo Club Rack. Golf Shoe Wall In The New Shop. New Grip Wall. Fully Stocked With Golf Clubs.
Custom Hat RackBuilt Locally By Mr. Jim Dellinger. Custom Glove Display. Custom Built 3 Tier Bag Display. The Slab Is Poured For Both The 1st Level & The Smash Factory.
March 26 Update
New Putter Display Built Locally By Ridgeview Millwork. Smash FactoryGoing Up. First Look At Our Custom Designed Tee Dividers. Stairs To The Top Deck & Smash Factory In The Process Of Being Built. The Completed Walkway To The Range.
April 11 Update
Looking Back From Bay 20 On Power Tee Install Day. The padding and carpet being installed in the Smash Factory. Final seal on the top deck with the railing completed. The safety netting was installed. The new poles and netting separating the double decker from the grass tees.